User Manual

Table Of Contents
Contents RF-Orchestra!™ Transmitter Installation and Operation
xxvi 6880493G02-C July 2000
Hardware Options, 2-27
Software Options, 2-27
Network Peripheral Options (Option X267), 2-27
RF-Baton! Transmitter Controller without GPS Receiver (Option X594), 2-28
RF-B! Transmitter Controller with GPS Receiver (Option X179), 2-28
Battery Revert (Option X649), 2-28
RF-O! Transmitter Peripheral Options (Option X263), 2-28
RF-A! Receiver (Option X349, X351, X352, X353), 2-29
RF-A! Receiver Peripheral Package (Option X88, X89), 2-29
Equipment Specifications, 2-30
Environmental Requirements, 2-30
General Specifications, 2-31
Electrical Requirements, 2-33
AC Service, 2-33
Preinstallation, 3-1
Site Planning, 3-1
Site Considerations, 3-1
Equipment Cabinets, 3-2
Transmitter Breaker Panel Access, 3-4
Disabled Personnel, 3-4
Hazardous Materials and Equipment, 3-5
Seismic Active Areas, 3-5
Telephone Company (TELCO) Line Interface, 3-5
Environmental Considerations, 3-6
Grounding Requirements, 3-7
Ground Rings, 3-7
Tower Grounding, 3-7
Site Building and Equipment Grounding, 3-8
Cabinet Grounding, 3-8
Antenna Installation, 3-11
Antenna Feed Line Requirements, 3-11
Antenna Feed Line Identification, 3-11
GPS Antenna Planning, 3-12
Inspection of Equipment, 3-15
Installation, 4-1
Tools and Equipment, 4-4
Recommended Tools, 4-4
Recommended Test Equipment, 4-5
Recommended Parts, 4-6