User Manual

Table Of Contents
RF-Orchestra!™ Transmitter Installation and Operation Installation
July 2000 6880493G02-C 4-17
AC Power Connection
The RF-Orchestra! paging station comes from the factory with the power cord attached to the
AC distribution chassis. Before plugging the line cord into the power receptacle, place all
equipment power switches in the OFF position. Verify the following switches are in the OFF
position (see Figure 4-10).
Note: Numbers in parentheses correspond to the numbers shown in Figure 4-10.
AC Distribution Panel (three circuit breakers)
Main Breaker - OFF (1)
TX Breaker - OFF (2)
AUX Breaker - OFF (3)
AC Power Supplies - OFF (up to four) (4)
RF-Baton! (RF-B!) Transmitter Controller - OFF (5)
Note: Refer to appropriate transmitter controller manual if other than the RF-B! transmitter
controller.
Orchestra Control Module - OFF (6)
Co-located RF-Audience! Receivers - OFF (7)
Peripheral Equipment (if supplied) OFF (8)
Connect the cabinet AC power distribution chassis to the AC power source supplied for the
RF-O! paging station cabinet as follows.
1. Open the rear door of the cabinet and locate the AC power cord.
2. Remove the retainer securing the power cord to the cabinet frame.
3. Place the step ladder at the rear of the cabinet.
4. Route the power cord out through the top of the cabinet (see Figure 4-10).
5. Connect the power cord to the 240-V receptacle provided for the RF-O! paging station
cabinet.