Specifications
Calibration
cal_1419.vee: This program operates stand-alone. However, it is easy to merge it
directly into VEE application programs to provide easy access to the calibration
sequence. The Agilent VEE detail view is all that is developed as illustrated in
Figure 5-3. A counter in the upper right-hand section of the detail gives the number
of seconds elapsed so it can be determined if progress is being made.
This program performs a *CAL? and CAL:STORE ADC to perform a complete
calibration of the VT1419A card. Any errors detected are displayed so that the
exact channels in question can be identified. Calibration may take from 3 to 10 or
more minutes to occur, depending upon the number and type of SCPs loaded.
Calibration should be performed whenever SCP’s are moved or added. After
turn-ON, wait 1 hour for the VT1419A to reach temperature stabilization before
performing calibration.
VEE Programming Examples
Calibration
Chapter 5 147
Figure 5-3: Calibration Detail View
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










