Specifications
– 9 –
4. Observe water level gauge sight glass to verify required water level.
• Keep both valves on the water gauge open at all times.
5. Press the reset switch with the green indicator light lit to light the boiler.
6. Both Low Water and High Pressure indicator lights must be off before the burner will ignite.
• If the indicator lights do not go off after 15 minutes or if they come on during normal operation,
press [ 0 ] on the power switch for off and contact an authorized Vulcan-Hart servicer.
7. If the burner does not ignite after 30 seconds, press [ 0 ] on the power switch for off, wait 5 minutes,
then repeat steps 1 – 5.
• If the ignition does not occur after 3 tries, press [ 0 ] on the power switch for off and contact an
authorized Vulcan-Hart servicer.
8. Steam generation will begin in about 10 minutes.
• Observe that the boiler pressure gauge indicates steam pressure in the range of 8 –12 psig.
9. Set all timer dials to 0 minutes.
10. Open all compartment doors and observe that no steam has entered
the cooking compartments.
11. Close compartment doors.
12. Set all timer dials to 2 minutes.
• Steam will be heard entering the compartments.
13. Wait until 1 minute is left on the timers.
14. Open each door and observe that steam has stopped entering into
each compartment.
15. Close compartment doors.
• Steam generation and timers resume.
• Make sure that steam from the drain is being cooled by water from
the cold water condenser.
16. When timer dials are at 0 minutes, steam flow to the compartments
stops.
17. Silence the buzzers.
18. Press [ 0 ] on the power switch on the boiler (Fig. 1) to turn the steamer off.
• Boiler will automatically blow down.
AUTOMATIC BLOWDOWN
When [ 0 ] on the power switch on the boiler (Fig. 1) is pressed, the boiler will blow down for
approximately 5 minutes.
COMPARTMENT
OPERATION
Refer to page 12 for
M
ANUAL CONTROLS.
Refer to page 13 for
A
UTOMATIC CONTROLS.
Refer to page 14 for
P
RE-VENT AUTOMATIC
CONTROLS.