Specifications

8
Broilers Shipped in Two Pieces for Restacking
The incorporation of the stacking straps will eliminate the use of the two oval slots, one to the left and
one to the right, behind the finishing back of the top section. (See Step 2 under Broilers Shipped Pre-
Stacked.)
1. Position broilers as near to installation location as
possible. Remember to allow enough room to complete
stacking procedures.
2. Carefully lift top section and rest it evenly onto the
bottom section.
3. Remove top section drip pan. Align two holes, one to
the left and one to the right of the upper drip pan area,
behind the broiler front frame. Insert two 10-24 bolts
and assemble the top section to the bottom section.
4. Replace the drip pan.
5. From rear of broiler, remove two 10-24 bolts from the
upper corner of the left- and right-hand bottom section
finishing back.
6. Using four 10-24 bolts, assemble the stacking strap
as shown in Fig. 4. This will complete the stacking
procedure.
DRAFT HOOD INSTALLATION - GHCB40 OR GHCB44
All GHCB40's and GHCB44's come equipped with a hood flue diverter that is packaged and laying in
the top broiler compartment. This flue diverter must be attached to the unit at the time of installation,
following the steps below:
1. If the diverter has protective plastic covering the assembly, remove all the plastic.
2. Place the diverter on top of the unit covering the flue (Fig. 5).
3. Remove four 10-24 sheet metal screws from the top rear flange of the broiler (Fig. 6).
PL-41719-1
HOOD
FLUE
DIVERTER
FLUE
SCREWS
PL-41720-1
Fig. 5 Fig. 6
Fig. 4
STACKING STRAP
PL-56559