Specifications
– 11 –
4. Center bricks are installed towards the center of the broiler in three rows of four bricks each. Install
the center bricks similar to that of the side bricks in Step 3. Angle the bricks and slip them up
between the burners, then set them in place.
NOTE: The center bricks are to be installed to rest between two burners on the vertical burner flange
(Fig. 14 and 15).
PL-41728 PL-41729
Fig. 14 Fig. 15
LEVELING AND CONNECTING MANIFOLDS - ALL MODELS
The IR2 Model is not designed to be batteried to other heavy duty equipment. After leveling the IR2
Model, as described in Step 2, proceed to Gas Connections.
1. Place the broiler in its exact position or battery lineup.
2. Using a carpenter level, level the broiler from front to rear and from side to side. Unless the broilers
are level, they will not give proper cooking results, and equipment being batteried will not draw up
tight.
As of January 1998, Vulcan-Hart appliances use Ward gas unions instead of Stockham gas unions.
If you are installing a new battery range to an existing field appliance, the union on the existing field
appliance must be checked against the union being used on the new range. The union manufacturer’s
name around the face surface of the union nut must match. The new range has been shipped with a
Ward union. If the old appliance has something different, i.e., Stockham, it must be replaced with a Ward
union. Failure to replace this union could result in a gas leak (Fig. 16).
If a Ward gas union is needed for installation, it may be obtained through the Vulcan-Hart Parts
Department.