Installation guide
Synapse Installation Guide 27 [ATA] Optional ATA Installation
To install the ATA: (Continued)
Figure 31. ATA Synchronized
The ATA takes about a minute to power up.
After the ATA has found the network and the gateway, Synchronized displays on
the third line of the display, as shown in Figure 31. This is the Idle screen.
The time and date may not be correct. The time and date are set using the
WebUI. See System Basic Settings in the “Synapse Administrator’s Guide” at
www.telephones.att.com/synapseguides.
Figure 32. ATA Line Installation
Screen Device Status LEDs
AUX INFXS 2
FXS 1
ATA
AUX OUT
Station Ports










