Installation guide

Synapse Installation Guide 16 Gateway Installation
To install the Gateway: (Continued)
Figure 13. Synchronized
The Gateway takes about a minute to power up.
After the Gateway has found the network and another installed Synapse device, Synchronized
displays on the third line of the display, as shown in Figure 13. This is the Idle screen.
The time and date may not be correct. The time and date are set using the WebUI. See
System Basic Settings in the “Synapse Administrator’s Guide” at
www.telephones.att.com/synapseguides.
Figure 14. Gateway Line Installation
LINE 1 through LINE 4
BYPASS
Screen
Gateway
Line LEDs