User Manual
Table Of Contents
Hinge
Petroleum jelly
STABILIZER
A
B
Apply 5 min.
Epoxy both the
top and bottom.
Apply a thin layer of machine oil or
petroleum jelly to only the pivot point of
the hinges on the rudder, then push the
rudder and its hinges into the hinge slots
in the trailing edge of the vertical stabilizer.
There should be a minimal hinge gap.
When satisfied with the and alignment,
hinge the rudder to the vertical stabilizer
using 5 minute epoxy. Make sure to apply a thin layer of epoxy to the right and left
of both hinges and to inside the hinge slots.
Tail wheel control arm
Tail wheel push-rod
1
2
3
4
1- Insert the tail wheel pushrod into the hole on
the tail gear control
horn (as show).
2- Install the tail wheel control horn in place.
4- Secure the tail wheel control horn in place using
a 5/64”(2mm) screw set, Ensure smooth
non-binding movement.
...............1
Tail landing gear
..........1
............1
2x3mm screw
.................1
Tail wheel control-
horn
2mm I.D collar
3- Instal the tail wheel gear in place.
Plastic control horn
...........3 set
Rudder / Seitenruder
13-
Tail gear / Heckfarwerk
14-
Tail gear / Heckfarwerk
15-
BOTTOM VIEW
UNTERSICHT
BOTTOM VIEW
UNTERSICHT
Securely glue together. If coming off during flight,
you lose control of your air plane.