Technical Specifications
2
INITIAL MAINTENANCE SPECIFICATIONS
1. See VPI PRT Installation and Maintenance instructions for all requirements.
2. PRT three part maintenance system required for required aesthetics and performance
POST INSTALLATION SPECIFICATIONS
1. VPI 100 2 epoxy requires 72 hours to dry before foot traffic allowed and 4-5 days before initial
maintenance.
2. VPI 520 1 part pressure sensitive adhesive requires 72 hours to dry before foot traffic allowed
and 4-5 days before initial maintenance.
3. Spray-Lock 6500 1 part pressure sensitive adhesive requires 72 hours to dry before foot traffic
allowed and 4-5 days before initial maintenance.
WARRANTY INFORMATION
1. 25 year wear-through warranty
2. 75 year warranty free from defects in workmanship and materials
PRT Specs 13: 03-03-13