Installation Instructions

STAIR WELL MAINTENANCE
EQUIPMENT REQUIREMENTS
Backpack vacuum
Micro Fiber applicator pad (green) and handle
Never use oil base treated dust mops.
Putty knife
Masking tape tape off areas not requiring Flex
Shield
Spray bottle and pH neutral cleaner
Clean towels
6 round piece of maroon pad for stubborn areas
Small bucket and water
LANDING TILE REQUIRED INITIAL
MAINTENANCE
NOTE: Landing tile become slippery when wet and care
must be taken. Appropriate barriers to wet areas and
“warning / caution” placards should be used in all
instances.
Landing tiles are maintained by hand. Use of an
automatic scrubber is not required.
Initial maintenance is required to ensure good
visual appearance.
Remove dried adhesive with a sharp putty knife or
Goo Gone and a cloth, surface may dulled by this
process.
Protect the landing tile after installation & before
initial maintenance to prevent soiling or damage.
Allow the adhesive on the installed Landing Tile to
thoroughly dry 48 hours before completing the
initial maintenance.
Vacuum or sweep the Landing Tile to remove any
loose soil.
Damp mop surface with a pH neutral cleaner to
remove dust and debris that cannot be removed
with vacuuming or sweeping
Allow the landing tiles to air dry.
VPI Landing Tile cannot be harmed by lack of
maintenance.
For enhanced aesthetics, apply Flex Shield as a
uniform thin to medium coat using a pre-rinsed,
clean synthetic finish mop or microfiber applicator
system. Allow the Landing Tile finish to dry
approx. 30 minutes before applying the next coat.
The coating dries in about 30 minutes per
application. 3 to 5 coats are required, depending
on desired gloss level. Replace the microfiber pad
after each coat, or more frequently if needed, for
best results.
LANDING TILE ON-GOING MAINTENANCE
NOTE: Landing tile become slippery when wet and care
must be taken. Appropriate barriers to wet areas and
“warning / caution” placards should be used in all
instances.
Sweep or dust mop the landing tile to remove any
large debris
Never use oil base treated dust mops.
Damp mop using a pH neutral cleaner. Rinse with
clean water & allow to dry.
As desired, apply Flex Shield to cleaned floor
using a microfiber pad, waiting 30 minutes
between coats. The number of coats required
depends upon the desired gloss level.
Any questions about surface preparation, sub-floor conditions or general installation questions or
maintenance not covered in these instructions, please contact VPI.
VPI Corporation, 3123 S.9th Street, PO Box 451, Sheboygan, Wisconsin 53082-0451 U.S.A.
Phone: (920) 458-4664 Fax: (920) 458-1368 - Customer Service: (800) 874-4240
Email: floor@vpicorp.com Website: www.vpiflooring.com