Technical Specifications

2
INITIAL MAINTENANCE SPECIFICATIONS
1. See VPI Landing Tile Installation and Maintenance instructions for all requirements.
2. Initial maintenance is required for proper aesthetics and performance.
POST INSTALLATION SPECIFICATIONS
1. VPI 503 1 part pressure sensitive adhesive requires 48 hours to dry before foot traffic and initial
maintenance.
2. VPI 520 1 part pressure sensitive adhesive requires 48 hours to dry before foot traffic and initial
maintenance.
3. VPI 100 2 epoxy requires 48 hours to dry before foot traffic and initial maintenance.
WARRANTY INFORMATION
1. 25 year wear-through warranty.
2. 75 year warranty free from defects in workmanship and materials.
Landing Tile specs 19