Installation guide
Acme Packet 6100 Hardware Installation and Maintenance Guide 79
Figure 6 - 111. Process for Installing the SODIMM (l-r)
Pre-Installation
Guidelines
Please read and follow these pre-installation guidelines prior to replacing the
SODIMMs:
• The
SODIMMs can be installed only in the designated location as
described previously in this manual.
• No
te the installation location of the SODIMMs on the NIU PCB.
• G
round yourself and follow proper ESD grounding procedures.
• Rem
ove the SODIMM(s) from the shipped packaging.
• Inst
all the SODIMM(s) according to the procedure below.
• This p
rocedure should be performed during low-traffic periods or during
times of scheduled maintenance.
• Fo
llow industry-standard procedures to ensure ESD protection.
• W
hen installing or removing a NIU card, move the card to an ESD-safe
location.
Caution Before handling an Acme Packet 6100 Transcoding NIU card,
follow the proper ESD grounding procedures. Failure to do so
could damage the NIU card and its components.
Required Parts The following parts are required to replace the SODIMM(s) module.