Installation guide

48 Acme Packet 6100 Hardware Installation and Maintenance Guide
2. Place the lug on the end of the grounding cable onto the grounding posts.
Figure 4 - 69. Grounding Cable Over the Grounding Terminals
3. Screw the two kep nuts onto the grounding post, securing the grounding
lug in place. When attached correctly, the grounding lug fits snugly
between the chassis’s rear panel and the kep nuts.
Figure 4 - 70. Kep Nuts Securing Grounding Cable to Grounding Terminals
4. Connect the other end of the grounding wire to a suitable grounding point
at your site.
Caution Always make the ground connection first and disconnect it last
when installing or removing the system from an equipment
rack.
AC Power Cord
Installation
This section shows you how to install an AC power cord.
Caution Use a 15 Amp fused circuit for each AC power supply.
Important: This equipment is intended for installation in locations where
National Electrical Code (NEC) applies.
To install the AC power cords in the Acme Packet 6100: