Installation guide

Acme Packet 6100 Hardware Installation and Maintenance Guide 43
Installing the
Chassis in the
Rack
The Acme Packet 6100 is now ready to be installed into a 4-post equipment
rack. To prevent personal injury or damage to the Acme Packet 6100 follow
these guidelines:
Th
is installation requires two people and should not be attempted
otherwise.
F
ollow your organization’s best practices for lifting and installing heavy
components into an equipment rack.
Ensure that the Acme
Packet 6100 chassis remains supported until you
have completely installed it into the equipment rack.
To install the Acme Packet 6100 c
hassis into the equipment rack:
1. Lift the Acme Packet 6100 into the correct position to prepare to be
in
stalled into the equipment rack.
2. Line up the chassis slide rails in bac
k of the chassis with the guides in front
of the equipment rack slide rails.
Test Equipment Slide
Rail Guides
Figure 4 - 61. Equipment Rack Slide Rail Guides
3. Push the Acme Packet 6100 fully into the equipment rack.
Alarm
Alarm
Power
Silence
Acme Packet
AP6100
Figure 4 - 62. Acme Packet 6100 Inserted Into the Chassis Slide Rails