Installation guide
Acme Packet 6100 Hardware Installation and Maintenance Guide 43
Installing the
Chassis in the
Rack
The Acme Packet 6100 is now ready to be installed into a 4-post equipment
rack. To prevent personal injury or damage to the Acme Packet 6100 follow
these guidelines:
• Th
is installation requires two people and should not be attempted
otherwise.
• F
ollow your organization’s best practices for lifting and installing heavy
components into an equipment rack.
• Ensure that the Acme
Packet 6100 chassis remains supported until you
have completely installed it into the equipment rack.
To install the Acme Packet 6100 c
hassis into the equipment rack:
1. Lift the Acme Packet 6100 into the correct position to prepare to be
in
stalled into the equipment rack.
2. Line up the chassis slide rails in bac
k of the chassis with the guides in front
of the equipment rack slide rails.
Test Equipment Slide
Rail Guides
Figure 4 - 61. Equipment Rack Slide Rail Guides
3. Push the Acme Packet 6100 fully into the equipment rack.
Alarm
Alarm
Power
Silence
Acme Packet
AP6100
Figure 4 - 62. Acme Packet 6100 Inserted Into the Chassis Slide Rails