Installation guide
34 Acme Packet 6100 Hardware Installation and Maintenance Guide
Unpacking the Acme
Packet 6100
To unpack the Acme Packet 6100:
1. Inspect the external packing materials and note if they are damaged in any
wa
y.
2. Open the exterior box.
3. Unpack the contents of the Acme
Packet 6100 shipment.
4. Locate the packing list on the outside of the Acme Packet 6100 shipment
bo
x.
5. Confirm that all of the components listed in the packing list are present
a
nd in good condition.
If you discover that any of the parts are missing or were damaged in
shi
pment, send an email to tac@acmepacket.com to request assistance.
Mounting Hardware The hardware used for the Acme Packet 6100 mounting procedures include the
foll
owing:
• Front mounting flanges (2) for use with mounting slide rails, used to
secure the c
hassis into the rack
Figure 4 - 37. Front Mounting Flanges
• Slide rail assembly (2), as shipped, with the chassis slide rail inserted
into the equipment rack slide rail.
Figure 4 - 38. Slide Rail Assembly