Installation Guide

11
HORIZONTAL INSTALLATION (SEE FIGURES 3.1 & 3.2)
Step 1- Position appliance:
Locate the appliance in accordance with the appliance manufacturer’s instructions and
clearance specifications. Pay particular attention to the outlet flue collar of the appliance and
endeavor to position it between the wall studs. Install a Stove Adapter (H) or Stove Adapter
Tee (A) by first applying high temperature sealant onto the appliance flue collar and then
secure the Stove Adapter with a minimum of (3) #8 x ½” self-drilling screws
Step 2- Rough Frame Wall Opening:
The wall opening should be centered between two wall studs. To determine the height of
the opening it is helpful to preassemble the pipe and fit to the Stove Adapter/Tee. Mark the
location on the wall. Cut and frame the opening. Refer to table 1 for rough opening
dimensions.
Step 3- Wall Pass-Thru Installation:
A Wall Pass-Thru (I) must be used when the pellet vent pipe passes through a combustible
wall. The Wall Pass-Thru consists of three parts: The exterior fire stop section, the
adjustable extension, and the interior trim plate. Install the fire stop section on the outside
wall with the tube section pointing to the structure interior. It is recommended to seal the
outside edges of the fire stop section with a water proof silicone caulk. Secure the fire stop
section to the framing with a minimum of four to 8-penny nails or four #8 x 1-1/2” wood
screws. From the interior, slide the adjustable extension onto the fire stop section tube.
Adjust the extension so that it will be flush with the interior trim plate once installed. Use a
minimum of three self drilling screws to secure the adjustable extension to the fire stop tube.
Step 4- Pipe Installation:
Insert the first pipe section (B) through the Wall Pass-Thru (I) and connect its female end to
the Stove Adapter (H) with a minimum of (3) #8 x ½” self-drilling screws. Attach sufficient
pipe to extend 6” beyond the exterior wall. All pipe sections must be secured by tightening
the band clamp located on the female end of the outer pipe.
Step 5- Install Cap:
Follow the above listed NFPA 211 (USA) or CSA B365 (Canada) rules for distance of exit
terminal from windows and openings (see General Specifications section). Attach a
Horizontal Cap (L) by tightening the band clamp around the last section of pipe. The cap
must be at least 6” from the wall.