Instruction Manual

P/N: 4GL020-010
©2008 Vortech Engineering, LLC
All Rights Reserved, Intl. Copr. Secured
08OCT08 v5.0(99-07 GM Trk (4GLv5.0))
20
16. FINAL ASSEMBLY AND CHECK
A. Reconnect the battery.
B. If your vehicle has gone over 10,000 miles since
its last spark plug change, you will need to
change the spark plugs now before test driving
the vehicle.
C. Check all ttings, nuts, bolts and clamps for tight-
ness. Pay particular attention to oil and fuel lines
around moving parts, sharp edges and exhaust
system parts. Make sure all wires and lines are
properly secured with clamps or tie wraps. (See
Fig. 16-a.)
D. Check all uid levels, making sure that your
tank(s) is/are lled with 91 octane or higher fuel
before commencing test drive.
E. Start engine and allow to idle a few minutes,
then shut off.
F. Recheck to be sure no hoses, wires, etc. are
near exhaust headers or moving parts and check
for any sign of uid leakage. Recheck all uid
levels.
G. PLEASE TAKE SPECIAL NOTE: Operating
the vehicle without ALL the subassemblies
completely and properly installed may cause
FAILURE OF MAJOR COMPONENTS.
H. Test drive the vehicle.
I. Read the STREET SUPERCHARGER SYSTEM
OWNER’S MANUAL AND RETURN THE WAR-
RANTY REGISTRATION FORM within thirty (30)
days of purchasing your supercharger system
to qualify for the 3 year limited warranty.
Fig. 16.A-a