Instructions

Make good use of anti-static technology to protect components
from damage:
1) Quickly ground the internal and external conductor of the coaxial
cable before it is connected with the spectrum analyzer.
2) Staff must wear anti-static gloves before touching the connector
cord or doing any assemble work.
3) Assure all the instruments are grounded properly to avoid static
storage.
4.3 First Time to Power on
Connect the three-pin AC power cord into the instrument. Insert the
plug into a power socket provided with a protective ground.
!
WARNING
Check the power source before turning on the spectrum
analyzer, to protect the device from damage.
1) Press the power switch
on the bottom left of the front
panel.
2) Self-initialization takes about 30 seconds, after the boot screen
the spectrum analyzer will default to the scanning curve.
3) After power on, let the spectrum analyzer warm up for 30
minutes for stabilization to obtain the most accurate results.
9