User manual
1. Connect the protective contact power cable provided to the cold device connection (12) at the power supply.
Please ensure a secure t.
2. Connect the power cable to a protective contact socket. The total length of the power cable to the socket should
not exceed 3 m.
Place the laboratory network device onto a stable, level and insensitive surface. Please ensure that the ventilation
slits in the housing are not covered.
The laboratory network device is controlled by microprocessors and is operated via two digital setting controllers
(incremental encoders without end position) with button function. This enables the ne and rough control via a
controller.
A system check takes place after switch on. The test status is displayed on both displays. The display sequence is
as follows:
Display the current software status.
Segment test whether the display functions with all individual segments. Switch
over to the normal operational display after this step.