User manual
• Before rst commissioning, observe that the rear selection switch for the mains voltage (24)
is in the correct position.
• For Europe, set “230V”
• Connect the supplied grounding mains cable to the mains connection socket (21) on the function generator.
Ensure a tight t.
• Connect the mains cable to a protective contact socket with protective ground.
• Push the mains switch (19) to switch the generator on or off. The device is switched on when it is pushed.
• After activation, a self test runs that is indicated by all display segments lighting up. After the test, the generator is
ready for use. Observe a heat up phase of at least 30 minutes before taking up the measurements.
• To be certain that the output signal is symmetric as well as uninuenced by the wobbulator, observe the following
table:
Wobble function “SWEEP WIDTH” (14) pushed
Symmetry “SYM” (12) pushed
DC-offset (11) pushed
Dampener “ATT” (8) not pushed
Switch “COUNTER INT/EXT” (17) not pushed