Specifications

1
e
Contents
Page
Introduction Dear customer 1
Do’s and don’ts 1
Things you should know 1.1 Gas appliances 3
1.2 Electrical supply 3
1.3 Guarantee registration card 3
1.4 Benchmark log book 3
1.5 How does it work? 3
1.6 Additional features 3
1.7 Dimensions 3
1.8 Clearances 3
1.9 Filling valve 4
Getting started 2.1 Before switching on 4
2.2 Appliance controls 4
2.3 Lighting the boiler 4
How to… 3.1 Top-up the system 5
3.2 Reset the appliance 5
3.3 Understand the diagnostic fault codes 5
3.4 Shut down the system for short periods 5
3.5 Shut down the system for long periods 5
3.6 Care for the appliance 5
What if… 4.1 I suspect a gas leak 6
4.2 I frequently have to top-up the system 6
4.3 The status LED is flashing Red 6
4.4 The appliance is due its annual service 6
4.5 I need to call an engineer 6
Setting the Vokera…. Remote-control (RC05) 6
Mechanical clock 9
Digital clock 9
Dear Customer
Your “Syntesi e” boiler has been designed to meet and exceed the very latest standards in gas central heating
technology and if cared for, will give years of reliable use and efficiency. Please therefore take some time to read
these instructions carefully.
Do’s and Don’ts
Do ensure that the system pressure is periodically checked
Do ensure that you know how to isolate the appliance in an emergency
Do ensure that you are familiar with the appliance controls
Do ensure that your installer has completed the appliance log book
Do not attempt to remove the appliance casing or gain internal access
Do not hang clothes etc. over the appliance
Do not forget to have the appliance serviced annually
Do ensure that your installer or engineer uses only genuine Vokera spare parts
INTRODUCTION