Service manual
HEC-Series Service Manual
INSTALLING YOUR TUBE-ICE MACHINE
10/21/01
3-3
FIGURE 3-2
Forklift-&-Rope or Lifting Straps Method
You need: + extra head room
+ forklift with adequate load and height capacities
+ 1/2” rope or four lifting straps to bind forks to top angles
Step 1. Remove front, rear, and top access panels.
Step 2. Position fork truck so that forks are resting flat on top angles of Tube-Ice
®
machine.
Step 3. Use the rope or straps to securely bind forks to the top angles.
! CAUTION !
Be sure the bin is level and is set in its proper location.
See the space diagrams, FIGURE 3-4 and 3-5.
! CAUTION !
Step 4. Lift Tube-Ice
®
machine and set into drip pan of bin.
Step 5. Remove rope or straps and fork truck.
Step 6. Install front, rear and top access panels.
Step 7. Check alignment of ice chute to bin opening.










