Specifications

3-38 Install SLTM Gateway (optional)
Chapter 3 - Installation
Install SLTM Gateway (optional)
1. Install the SLTM2 module in an available slot. Connect the power cord.
2. Patch the LAN port on the SLTM2 module into a port on a SHUB8.
3. Connect the line cords for the SLT stations to the SLT ports on the back of the
SLTM2.
SLT station assignment is the same as for IP keysets; stations will be discovered
and assigned an ID that is one greater than the previous keyset.
Install CO Lines
It is recommended that you install the same line types together (LGCM, DIDM, BRIM) to
maintain order. These lines should also be installed one at a time.
SHUB8 Connection Diagram
Figure 3-29: SHUB8 Connection Diagram
SHUB8
SHUB8
SHUB8
Patch the port
marked "1x" to
the UPLINK port
of the first SHUB8
Identify the port
marked "UPLINK"
First connected
SHUB8 module
Second SHUB8
module
Third SHUB8
module
SHUB8
should be
connected to
MFIM before
connecting
additional
SHUB8s