Specifications

3-4 Verify Equipment On-site
Chapter 3 - Installation
Verify Equipment On-site
Once the equipment installation site has been identified and a dedicated AC outlet, earth
ground, lighting and ventilation are available, verify that all equipment and tools required
are on-site and the equipment has not been damaged during shipment. Check that the
type and quantity of Modules and terminals received are correct. Also assure optional
equipment and a Power Line Surge Protector are on-site.
Module Mounting Hardware Installation
Module Mounting Hardware InstallationModule Mounting Hardware Installation
Module Mounting Hardware Installation
Main Cabinet Installation
The Telenium
IP
Main Cabinet can be desk, 19” rack or wall mounted. The following
paragraphs provide directions for each of the mounting options.
Cabinet Pedestal Kit Installation
Cabinet Pedestal Kit InstallationCabinet Pedestal Kit Installation
Cabinet Pedestal Kit Installation
An optional Pedestal kit is available for the Main Cabinet. This kit must be installed when
the Main Cabinet is to be floor mounted to assure adequate ventilation. The four Pedestal
feet are mounted to each bottom corner of the Cabinet. A wiring tray is mounted on the
lower front of the Main Cabinet.
To desk mount the Cabinet:
1. Insert the Foot into the foot-hole at each bottom corner of the Cabinet and rotate
each Foot clockwise until locked securely.
2. Loosen the two screws at both sides of the Cabinet.
3. Slide the Wiring tray over the two screws and re-tighten securely.
Figure 3-1: Cabinet Pedestal Kit