6.7

Table Of Contents
4 Observe whether or not the host successfully powers back on.
5 For any host that fails to exit standby mode successfully, perform the following steps.
a Select the host in the vSphere Client and select the Configure tab.
b Under Hardware > Power Management, click Edit to adjust the power management policy.
After you do this, vSphere DPM does not consider that host a candidate for being powered off.
Enabling vSphere DPM for a DRS Cluster
After you have performed configuration or testing steps required by the wake protocol you are using on
each host, you can enable vSphere DPM.
Configure the power management automation level, threshold, and host-level overrides. These settings
are configured under Power Management in the cluster’s Settings dialog box.
You can also create scheduled tasks to enable and disable DPM for a cluster using the Schedule Task:
Change Cluster Power Settings wizard.
Note If a host in your DRS cluster has USB devices connected, disable DPM for that host. Otherwise,
DPM might turn off the host and sever the connection between the device and the virtual machine that
was using it.
Automation Level
Whether the host power state and migration recommendations generated by vSphere DPM are run
automatically or not depends upon the power management automation level selected for the feature.
The automation level is configured under Power Management in the cluster’s Settings dialog box.
Note The power management automation level is not the same as the DRS automation level.
Table 121. Power Management Automation Level
Option Description
Off The feature is disabled and no recommendations are made.
Manual Host power operation and related virtual machine migration recommendations are made, but not
automatically run.
Automatic Host power operations are automatically run if related virtual machine migrations can all be run
automatically.
vSphere DPM Threshold
The power state (host power on or off) recommendations generated by the vSphere DPM feature are
assigned priorities that range from priority-one recommendations to priority-five recommendations.
These priority ratings are based on the amount of over- or under-utilization found in the DRS cluster and
the improvement that is expected from the intended host power state change. A priority-one
recommendation is mandatory, while a priority-five recommendation brings only slight improvement.
vSphere Resource Management
VMware, Inc. 94