7.4

Table Of Contents
Post-Upgrade Tasks for
Upgrading vRealize Automation 9
After you upgrade vRealize Automation 6.2.5 to 7.4, perform any required post-upgrade tasks.
This chapter includes the following topics:
n
Port Configuration for High-Availability Deployments
n
Reconfigure the Built-In vRealize Orchestrator to Support High Availability
n
Enabling the Connect to Remote Console Action for Consumers
n
Restore External Workflow Timeout Files
n
Verify That vRealize Orchestrator Service Is Available
n
Reconfigure Embedded vRealize Orchestrator Infrastructure Endpoint in the Target vRealize
Automation
n
Restore Changes to Logging in the app.config File
n
Enable Automatic Manager Service Failover After Upgrade
n
Run Test Connection and Verify Upgraded Endpoints
Port Configuration for High-Availability Deployments
After finishing an upgrade in a high-availability deployment, you must configure the load balancer to pass
traffic on port 8444 to the vRealize Automation appliance to support remote console features.
For more information, see the vRealize Automation Load Balancing Configuration Guide in the
vRealize Automation Documentation..
Reconfigure the Built-In vRealize Orchestrator to Support
High Availability
For a high-availability deployment, you must manually rejoin each target replica vRealize Automation
appliance to the cluster to enable high-availability support for the embedded vRealize Orchestrator.
VMware, Inc.
75