2.5

Table Of Contents
Create the System Resource Bundle
The system resource bundle resides at the Data Director system level, and enables you to create, test, and run
base database virtual machines.
Prerequisites
n
Create a resource pool to use for allocating CPU and memory resources. See “Create a Resource Pool,” on
page 23.
n
Determine the storage resources that you want to include in the system resource bundle. Plan for storage
resources for database storage and resources for backup storage.
n
Determine the networking resource that you want to include in the system resource bundle. You can assign
only one network to the system resource bundle. The networking resource is used by the base DBVMs for
building base database templates.
NOTE If you do not configure your resource pool with these settings, you might have problems with system
resource bundle creation or other Data Director tasks.
Procedure
1 Log in to Data Director with system administrator privileges.
2 Select System, and click System Settings.
3 ClickSystem Resource Bundle in the left pane.
4 ClickCreate System Resource Bundle
5 Specify the following information about the resource bundle in the wizard.
Wizard screen Action
Name and Description
Type a name and optional description and click Next.
CPU and Memory
Select the resource pool from which you want to assign CPU and memory
resources and click Next.
Storage
Click Edit to select a datastore, and allocate the number of gigabytes to use
with Data Director, or allocate all unallocated space. Repeat the process for
backup storage.
NOTE Do not select a datastore that is in a datastore cluster.
Networks
Select the networks that you want to have available to this resource bundle.
These networks provide the public network for the organization's databases.
Resource bundles must use a database network when available.
The resource bundle is created.
What to do next
Create a base DBVM. See Chapter 4, “Building DBVMs and Base DB Templates,” on page 37.
Monitor Resource Usage
System administrators can view usage information for resource bundles and datastores and can reassign
resource bundles from the Manage & Monitor tab.
The focus of this task is on monitoring, not on changing current settings.
Prerequisites
n
Log in to Data Director as a user with system administrator privileges.
VMware vFabric Data Director Administrator and User Guide
22 VMware, Inc.