2.0
Table Of Contents
- vCenter Chargeback Manager User’s Guide
- Contents
- About the User's Guide
- Introduction to vCenter Chargeback Manager
- Configuring Administration Settings
- Authenticating and Managing Users, Roles, and Permissions
- Resource Based Authorization in vCenter Chargeback Manager
- Permissions Defined in vCenter Chargeback Manager
- Managing Roles
- Managing Users
- vCenter Chargeback Manager User Authentication
- Managing Chargeback Hierarchies
- Creating a Chargeback Hierarchy
- Managing a Chargeback Hierarchy
- View a Chargeback Hierarchy
- Add a vCenter Chargeback Manager Entity
- Add a vCenter Server Entity
- Rename a Chargeback Hierarchy or a Chargeback Entity
- Delete an Entity from the Hierarchy
- Delete a Chargeback Hierarchy
- Assign Attributes
- Move Entities Within a Hierarchy
- Allocate Computing Resource Units for a Chargeback Entity
- Share Virtual Machine Cost
- Backdate a Chargeback Hierarchy
- View Properties of a vCenter Server Entity
- Managing and Configuring vCenter Chargeback Manager Cost Elements
- Generating Reports
- Monitoring System Health
- Administration Utilities
- Index
Edit Cost Configuration of an Entity
The entity-specific cost configuration details can be set from the Configure Cost tab.
The cost configuration is applied on an entity for the specified cost model and time period. These cost
configuration details will be considered when a report is generated on the entity using the specified cost model.
IMPORTANT Ensure that you follow the sequence stated in this procedure. After you have entered some
information, reverting to an earlier step in the task might reset the entries on the page.
You must have entity cost modify privilege on the chargeback hierarchical entities to perform this task. You
must also have update privilege on the cost models and read privilege on the hierarchies.
Procedure
1 In the Configure Cost tab, click Edit Entity Cost.
2 Select the required hierarchy from the hierarchies included in the drop-down menu.
Only the hierarchies on which you have at least the read privilege are included in the drop-down menu.
3 Expand the hierarchy and select the entity for which you want to configure the costs.
4 Select the cost model for which you want to specify entity-specific cost configuration details on the selected
chargeback entity.
5 Specify the duration for which the cost configuration will be effective.
The default selection is Update from now onwards, indicating that the cost configuration details will be
effective from the time of setting these details on the entity till they are modified at a future date.
If you want to set the cost configuration details for a specific duration, select Update for the effective
period and specify the start and end date of the time period. The dates have to be entered in the
mm/dd/yyyy format. If the end time is not specified, the cost configuration details will be effective till they
are modified at a future date. You can view the existing cost configuration details for the specified time
period by clicking Get cost configuration.
6 (Optional) Select a cost template from the Apply a Cost Template drop-down menu.
Only the cost templates on which you have read privilege is displayed. The rate factors and fixed costs
defined in the cost template are populated in the corresponding fields on the screen.
7 Enter the rate factors for the computing resources in the Rate Factors tab and click Update Rate Factors.
The rate factor value can be between 0 and 999.99. The application considers a precision of up to two
decimal places. If the rate factor is not specified for a computing resource, vCenter Chargeback Manager
uses 1 as the rate factor of the computing resource.
If you have selected a cost template, the rate factors defined in the cost template are populated in the Rate
Factors fields corresponding to each computing resource. You can modify these rate factors, if required.
You can view the rate factors already defined for various computing resources for different time periods
by clicking Show next to Historical values.
When you click Update Rate Factors, only the defined rate factors are set on the entity. No other cost
configuration is set.
8 In the Fixed Costs tab, select the required fixed cost from the Apply a Fixed Cost drop-down menu and
click Add to the list.
The fixed cost is added to the list of fixed costs displayed in the table. For each fixed cost that you want
to include, repeat this step.