Service manual

Eccellenza Express Service Manual
48 May 15, 2015
8. Secure the tubing assembly to the new inlet valve with a new circle clamp
(Oetiker).
9. Reconnect the power wires to the valve.
10. Re-connect the water supply to the inlet valve.
11. Switch the machine power on the inlet valve will open and the water tank
will start filling.
12. Check for leaks and repair, if required.
13. Re-install the left side panel.