Service manual
Library Power Supply
1-20 Revision P 96041
Sun Confidential - Internal Only
8. Connect P1.
9. Open the cable lock and insert the cable from the P1 connector.
10. Close the cable lock.
1. P1 connector
2. Cable lock
11. Connect P2 and P3.
Note: Connectors P4 and P5 on the power supply are not connected.
1. Connector P2
2. Connector P3
12. Power-on the library and make sure that it fully initializes.
13. Verify that the drives in each drive slot power-on and initialize.
14. Run diagnostic tests (described in the L20 Tape Library User’s Guide, part 95961).
15. Return the defective FRU according to your country’s warranty agreement.
L201_188
1
2
L201_186
1
2