User`s guide
Table Of Contents
- Table of Contents
- Chapter 1 Introduction
- Chapter 2 Switch Installation
- Chapter 3 Switch Management
- Chapter 4 Technical Reference
- Appendix A Specifications
- Appendix B CLI Quick Reference
- Appendix C Event Messages
- Appendix D AL_PA Cross References
- Appendix E Glossary
- Index

VIXEL INSPEED™ SAN STORAGE SWITCH MODEL 375 CHAPTER 2 SWITCH INSTALLATION
USER’S GUIDE
EMBEDDED
IN THE FUTURE OF STORAGE 6
CHAPTER 2SWITCH INSTALLATION
INSTALLATION PREPARATION
After receiving the switch, perform the following steps to ensure the switch and other contents
arrived safely.
To unpack the switch:
1. Inspect the outer shipping container for any damage that may have occurred in shipping.
Report any sign of damage to the appropriate shipping agency.
2. Remove the switch and cables from the shipping container; save the shipping container,
foam, and antistatic bags—returning the switch in any other container is not advised.
Make sure the following parts are included:
• Switch unit
• RS-232 null-modem serial cable
•Power cables (2)
• Self-adhesive pads (4)
• Retention clips (2), screws (4), and washers (4) for securing the power cords to
the switch.
• Vixel InSpeed™ SAN Storage Switch Model 375 Quick Install Card
•Product Release Notes
• Vixel Safety and Regulatory Guide
• Additional documentation, including warranty information and the End User
License Agreement.
3. Inspect the switch thoroughly. (If any signs of damage are seen, notify a sales
representative and/or the shipping agency.)
Installation Preparation ................................ 6
Switch Installation....................................... 7
Switch LEDs ............................................... 9
SFP Compatibility ...................................... 12
Booting the Switch and SAN........................ 13
Power Supply/Fan Module Replacement ........ 14