Operating Instructions

Page 8 of 15
Groundin
ECB0013/xxx Groundin
g
cable colors to be used, 10 AWG (6 mm
2
)
SFP+ EGE0015/xxxx Finisar 10GBASE-LR,1310 nm, 1.4 km, SM, LC
After collecting the applicable cables, do the following:
1. Pull the cables to be connected to the pole on roof top.
2. Pull the cables through the pole (from bottom to top).
3. The cables are either already terminated with appropriate connectors or can be terminated
and crimped on the roof.
4. In case of field termination, crimp the connectors to the cables
4.3.3. Pandora Installation
Install the Strain Relief with the two MRT M3x8 screws to the bottom side of Pandora in
preparation for cable connection.
Take the Pandora node together with sleeve gasket and sleeve gasket plug up on the roof to the
point of installation.
1. Fit the Strain Relief Gasket and pull cable through.
2. Connect cables in the following order:
1. Start with the grounding (GND) cables, make sure the grounding cable is properly
terminated (Fork lug for 4mm screw) and well secured to the Earthing screw on
the Strain Relief.
2. Fit the Data cables (RJ45 or SFP respectively)
3. Connect power cables
1. If PoE is used to supply the Pandora with Power, make sure that the data
connector is connected in the black RJ45 connector
2. if DC feed is used, make sure also to connect the I/O cable
3. Secure the connected cables with the wing screw to the strain relief
4. Securing cables to be weatherproof
1. Put the cables in sleeve gasket plug
2. Make sure that unused slots have the correct dummy plugs inserted
3. Put the plug in the sleeve gasket
4. Slide the sleeve gasket in place and make sure it fits in to the grove on Pandora
node
5. Fit node end into pole while gently pulling the cables out at the foot of the pole
6. Rotate to desired orientation.
7. Tighten the C-clamp screw according to torque requirements.
8. Make a service loop of the cable at bottom of pole
4.3.4. Testing the Installation