Specifications
RailCorp Infrastructure Engineering Manual – Signalling
Maintenance Manual
Electric Point Machine Westinghouse Style M70 MKIII TMG E1583
5 Maintenance Procedures
5.1 General
Before commencing, notify the signalman and carry out normal safeworking
procedures. All PPE applying to personnel working on or near the track must be
the Signal Sectionman should be performed simultaneously.
observed. Whenever possible the maintenance activities of the Signal Electrician and
5.2 Tools
Description Size Quantity
BACHO adjustable spanner 18" (450mm) 2
BACHO adjustable spanner 15" (375mm) 2
BACHO adjustable spanner 12" (300mm) 2
Screwdriver 8" (200mm) 1
Chisel (cold) 1
Podger (claw type) 1
F.P.L. gauge 1/8" (3.2mm) 1
F.P.L. gauge 1/16" (1.6mm) 1
Whitworth, A.F. and metric socket 1 set
sets with drive extension and
ratchet 1 set
Whitworth, A.F. and metric ring
spanners
Relay spanner
1
Crank handle 1
Vernier Calipers 1
Special tool for clutch overhaul 1
Check also that the kit includes consumables such as chamois leather, cotton waste,
emery cloth, and lubricants.
5.3 Check that Point Machine is Secure
Holding down bolts should be checked for security and tightness. Check for lost
motion in switch connections, point slides, lock slides and detector rods.
Version 1.0 © RailCorp 2009 Page 34 of 52
Issue Date: 1 December 2009 Uncontrolled when Printed