Specifications

RailCorp Infrastructure Engineering Manual – Signalling
Maintenance Manual
Electric Point Machine Westinghouse Style M70 MKIII TMG E1583
4.8 Manual Cranking Device
4.8.1 Description
Manual operation is obtained by inserting a crank handle through a separately covered
hole in the cover of the machine. Opening of the cap on the cover reveals the yoke of
the cut-out mechanism, shown in Figure 4.8.1. Pushing the yoke across allows the
crank handle to be inserted onto the cut-out spindle and simultaneously opens the cut-
out switch through an extended shaft to disconnect the motor. Removal of the crank
handle re-closes the cut-out switch and restores the motor circuit.
4.8.2 Adjustment of Cut-Out Switch
Adjustment is achieved by the adjusting bolt as shown in Figure 4.8.1. The bolt should
be adjusted so that it just touches the plunger of the cut-out switch when the yoke is in
its normal position.
Version 1.0 © RailCorp 2009 Page 33 of 52
Issue Date: 1 December 2009 Uncontrolled when Printed