Specifications

RailCorp Infrastructure Engineering Manual – Signalling
Maintenance Manual
Electric Point Machine Westinghouse Style M70 MKIII TMG E1583
2.3.3 Installation of Lock and Detector Slides
A Installation of Lock Slides
1. Assemble lock slides with serrations together.
2. Using manual operation, throw the switch to the mid-stroke position.
3. Insert slides into machine so that serrations are on left hand side of machine
viewed from detector end and the bar with long set of serrations facing towards
same end of the machine.
4. Fit drop lug to appropriate end of bar and connect to points.
5. Adjust lock slides according to Section 4.3.2.
B
Installation of Detector Slides
1. Insert detector slides into machine with long threaded end for drop lug towards
points.
2. Connect to points and adjust according to Section 4.4.2.
Version 1.0 © RailCorp 2009 Page 13 of 52
Issue Date: 1 December 2009 Uncontrolled when Printed