Installation Sheet
1. Carefully remove all parts from the box.
2. Remove the bracket (H) from fixture body (K) by loosening the nuts (I).
3. Put the glass diffuser (J) into the fixture body (K).
4. Attach the bracket (H) to the fixture body (K) and secure with nuts (I).
5. Install the mounting plate (B) to the juntion box with mounting screws (C) provided.
6. Put canopy (E) flush to the ceiling, and secure with collar ring (F).
7. Open the chain quick link (G), then attach the chain quick link to the ceiling loop (D).
Secure the chain quick link.
8. Loosen the collar ring (F) and slip down the canopy (E) carefully.
9. Twist the power supply and ground wire together and push through the center hole of
the ceiling loop (D).
10. Connect the fixture ground (bare) wire with the ground wire from the junction box using
wire nut (A). If your house does not have ground wire, then attach this wire to the
green grounding screw inside of the junction box.
IT IS IMPERATIVE THAT THIS FIXTURE BE GROUNDED.
11. Connect the fixture Neutral wire (ribbed) with the neutral wire (White) from the junction
box using wire nut (A).
12. Connect the fixture Hot (smooth, marks with words) wire with the hot wire (Black) from
the junction box using wire nut (A).
DO NOT REVERSE THE HOT AND NEUTRAL CONNECTIONS OR SAFETY WILL
BE COMPROMISED.
Leslie 20" Semi-Flush
Item # SK 4207
WE RECOMMEND INSTALLATION OF THIS LIGHTING FIXTURE BE DONE BY A
LICENSED ELECTRICIAN.
WARNING***SWITCH OFF THE MAIN ELECTRICAL SUPPLY FROM THE MAIN
FUSE BOX/CIRCUIT BREAKER BEFORE INSTALLATION.
INSPECT ITEM CAREFULLY BEFORE ATTEMPTING TO INSTALL. IF THERE IS ANY
DAMAGE OR OBVIOUS DEFECT. DO NOT INSTALL.
ITEM MAY NOT BE RETURNED ONCE IT HAS BEEN INSTALLED.
NOTE: CAREFULLY UNPACK EACH PIECE IN TOP LAYER OF PACKING PRIOR TO
REMOVING. RETAIN ALL PACKING MATERIAL UNTIL INSPECTION AND
INSTALLATION ARE FINAL.
DAMP
junction box
A
B
C
D
E
F
G
H
I
J
K
Bulb
(Not included)