User manual

Versions
130
© 2014 Digital Vision
UM-2014.1-07
Two versions visible in dropped-down view.
You can change the active version by selecting any other version from the
list.
Versions are numbered Version 1 (original), Version 2 etc. To the right of the
version number is the Material Name.
Approving Versions
If you want to mark a version to denote that it is the preferred version, you can
do so by approving it. To do this:
1. Select the version that you want to approve from the versions list so
that it is the active version, visible on the timeline
2. Select the segment on the timeline so that it turns orange
3. Press the
Approve Version
button on the timeline toolbar
The version indicator will change from grey to green to indicate that you are
now viewing the approved version:
Green triangle signifies the approved version.
If you later select a non-approved version to view, the indicator will turn back
to grey.
You can change the approved version at any time, simply by selecting a
different version as the active version and approving it following the steps
above. This will set the previously approved version back to unapproved and
set the new selection to approved.