User`s guide

6
Upgrade Scenarios
5 Reinstall the operating system on the Hardware Node.
6 Install Parallels Virtuozzo Containers 4.7 on the Hardware Node.
7 Migrate the Containers back from the spare server to the Hardware Node, if necessary.
Consult the Parallels Virtuozzo Containers 4.7 User's Guide and Parallels Virtuozzo Containers 4.7
Installation Guide for detailed information on how to migrate Containers between Hardware Nodes
and to perform a clean installation of Parallels Virtuozzo Containers 4.7, respectively.
Upgrade Specifics
When upgrading the Hardware Nodes included in a Virtuozzo Group (called the Virtuozzo cluster in
SWsoft Virtuozzo 3.5.1 Service Pack 1), do the following:
1 Upgrade all Slave Nodes in the Group.
2 Upgrade the Master Node.