User`s guide

10
Upgrading from Parallels Virtuozzo Containers 4.0 and 4.6
Verifying the Upgrade
Follow these steps to verify that your system has been successfully upgraded to Parallels Virtuozzo
Containers 4.7:
Check that you can log in to the Hardware Node using Parallels tools: Parallels Virtual
Automation (former Parallels Infrastructure Manager and Virtuozzo Control Center) and Parallels
Management Console (former Virtuozzo Management Console).
Check that all Containers (formerly Virtual Environments) on the Hardware Node can be started
and stopped (using Parallels Virtual Automation, Parallels Management Console, and
command-line utilities).
Check that you can log in to Containers using Parallels Power Panel (former Virtuozzo Power
Panels).