User`s guide

Upgrade Scenarios 6
6 Install Parallels Virtuozzo Containers 4.6 on the Hardware Node.
7 Migrate the Containers back from the spare server to the Hardware Node, if necessary.
Consult the Parallels Virtuozzo Containers 4.6 User's Guide and Parallels Virtuozzo Containers
4.6 Installation Guide for detailed information on how to migrate Containers between Hardware
Nodes and to perform a clean installation of Parallels Virtuozzo Containers 4.6, respectively.
Upgrade Specifics
When upgrading the Hardware Nodes included in a Virtuozzo Group (called the Virtuozzo
cluster in SWsoft Virtuozzo 3.5.1 Service Pack 1), do the following:
1 Upgrade all Slave Nodes in the Group.
2 Upgrade the Master Node.