Specifications

240
Viper Installation and Operation Manual 2.08
Headlands 2 Separate
The Headlands 2 Separate pattern allows you to set a straight swathing pat-
tern for a field that has a double headlands area around the boundary of the
field.
Setting the Headlands 2 Separate Pattern
During the job setup, select Headlands 2 Separate as the swath pattern.
Once the job is started:
1. Enter the headland area and press Begin Boundary..
2. Drive to the boundary of the field. Viper records the path you drive
through the headlands area.
3. Press End Boundary when you reach the end of the boundary.
Remember: Viper will automatically close the boundary
when the vehicle is within one boom length from the Set A
point.
4. Drive the second pass through the boundary. Viper guides the
vehicle based on the first pass through the headland.
5. Press End Pass 2 when you reach the end of the second boundary
pass.
6. Turn into the field and press Set A.
7. Drive to the end of the first swath path and press Set B. The first
swath path is now set.
All consecutive swath paths are based on the original A-B swath path points.
Helpful Hint: Viper displays a distance to headland count-
down when you are approaching or leaving the headlands
area.