User Manual Node: Smart Barrier Model: Version V1.0C & V1.0D Manual Revision: 1.0 Viotel Smart Barrier Manual www.viotel.co sales@viotel.
Contents 1 2 3 4 Introduction .................................................................................................................................... 3 1.1 Warning ................................................................................................................................... 3 1.2 Parts List .................................................................................................................................. 3 1.3 Required Tools .........................
1 Introduction 1.1 Warning This guide intends to assist in the preferred mounting, operation and usage of Viotel’s Smart Barrier Node. Please read and completely understand this user guide in order to make sure the safe and correct use of the system as well as maintain the longevity of the device. Please read and completely understand this user guide in order to make sure the safe and correct use of the system as well as maintain the longevity of the device.
2 Usage 2.1 Recommended Mounting Procedure It is highly recommended that the Viotel SMART Barrier Node be installed on the last full barrier section before the anchor block downstream of the flow of traffic. The device can efficiently detect strain and crashes along the entire length of the barrier from this position. Figure 1 Locate wire rope node close to the end of barrier 2.2 Indicated Key Location Wherever instructed to tap the node using the magnet, do so at the spot indicated “X”.
2.3 Mounting Orientation (Recommended) It is important to position the solar panel on the side of the barrier for maximum sun exposure. In Australia and New Zealand then is a northerly aspect and consideration should be given to position of overhead structures and trees that throw shade during the date (particularly if the installation occurs at night with road lane closures). SMART BARRIER ORIENTATION STRAIN BAND ORIENTATION 2.
Feed a bolt (Part 5) through the aligned hole from under the bracket. With the bolt’s seen through the node (Part 1), place a washer (Part 6) and tighten a bolt (Part 7) on. Repeat this process until the smart barrier node (Part 1) is firmly attached to the bracket (Part 3). 2.5 Standard Wire Rope Installation STEP 1 DESCRIPTION Using a tool like coil spring compressor clamp: compress both the top and bottom wire ropes.
It is recommended the node (Part 1) is mounted onto the wire rope; however, it can be attached to posts if needed. 2.6 Anchored Wire Rope Installation (Not Recommended) STEP 1 DESCRIPTION Locate the top and bottom wires in the wire rope barrier on the side of the anchor block. Using a tool like coil spring compressor clamp: compress both the identified top and bottom wire ropes.
3 Operating Instructions 3.1 Operation By default, your Viotel Smart Barrier Node will be set to Off. To change the mode that the smart barrier node is in; simply take the magnet (Part 4) and double tap it over the Indicated Key Location. A double green blink every 30s on status LED (lower) will indicate that the device is now On. All operations and LED indications refer to firmware version: 02.02.00, please be aware future states may change some functionality.
Stage 2. Link Established & Communicating Correctly: indicated by Three Blue Blinks. Stage 3. Firmware Updates: indicated by Green Blink or Red/Green Blink (see 3.3 System Communications Indicator (Upper LED) for details). Communication Complete: indicated by Solid Aqua. Off The device will check for any wake-up commands, such as the Magnet (Part 4) or user defined data collection interval. If there is enough power for the device to be On, it will be indicated by Blue Blink Twice every 30 seconds.
3.3 System Communications Indicator (Upper LED) Please refer to table below in conjunction with section 3.2 for details. LIGHT INTERVAL MEANING Green Blink 1s Communicating DESCRIPTION VISUAL Stage 1 (see 3.2 System Status for details). Three Blue 3s apart Communicating Green Blink Stage 2 (see 3.2 System Status for details). Blinks N/A Communicating The Link has been established and there are no firmware updates.
3.4 System Status Indicator (Lower LED) Please refer to table below in conjunction with section 3.4 for details. LIGHT INTERVAL MEANING DESCRIPTION Green Blink 30s On - Normal See 3.2 System Status for Operation details. Confirmed Key Input This indicates that the device Twice Green Blink Blank 2s (after second has detected the key and will tap) begin its next process. N/A No activity VISUAL The Device is currently in Off status.
4 Maintenance The product should not require any maintenance after installation. Only service personnel authorised by the manufacturer may open the inner enclosure. No user serviceable parts are located inside. 4.1 Cleaning If the need to clean the product should arise, use only a damp cloth and mild detergent. Do not use any solvents as this may damage the enclosure. 4.2 Downloading Data The only way to retrieve data is over the cellular communications. This can be activated on demand using the magnet.
Viotel Offices Sydney Suite 3.17, 32 Delhi Road Macquarie Park, NSW, 2113 Auckland Suite 1.2, 89 Grafton Road Parnell, Auckland, 1010 Remote Offices: Brisbane, Hobart support@viotel.co | viotel.co USER MANUAL | Smart Barrier Node V1.