Installation Guide
0 3
Step 1. preparation
1.1
INSPECTING AND PREPARING TILE
Make sure to inspect your tile upon its arrival. Take photos
of the delivered freight, and note any damage on the
driver's documents before you sign for it. Store the tiles
inside, in a clean, dry place. On installation day, make sure
to set up multiple boxes, so that tiles can be examined,
cleaned, and set in a rotation. This helps disperse slightly
lighter or darker tiles harmoniously through the
installation. When stacking tiles, try to always stack "face
to face" and "back to back". The rougher back can scratch
the front surface, as weight stacks on.
Pull tiles from different boxes for a natural look and make
sure you or your tile setter understands the layout. Many
patterns must be rotated as they are set, to complete the
pattern. Some patterns repeat in a single tile, while others
may require multiple tiles.
1.2
SELECTING SEALANT
All cement tile must be sealed during installation (even
those called "pre-sealed", or "pre-treated"). Make sure to
understand and have available the appropriate sealant for
your application.
all cement tile must be sealed
Visit villalagoontile.com for help selecting
the best sealant for your project.
© 2 0 0 8 - 2 0 2 1 , V I L L A L A G O O N T I L E . A L L R I G H T S R E S E R V E D .










