Installation Instructions

10
Site Preparation
Note: It is recommended that a thorough site inspection be conducted PRIOR to unpacking and moving this appliance.
• Con rm available access to adequate power—see electrical requirements.
° Single oven units require a 30 amp circuit
° Double oven units require a 50 amp circuit
•Note: A minimum of 2” spacing above and below the oven to any adjacent items is required for ventilation purposes.
•It is recommended that 3/4” or thicker material be utilized to create a support platform for this appliance.
BE SURE that support for this appliance is perpendicular to the front facing of the wall or cabinet before you perform the
installation.
•Use of a hydraulic lift is recommended for the installation of double oven units. Be careful not to bend lower trim/vent.
•All openings in the wall behind the appliance or in the  oor under the appliance should be sealed.
•Keep appliance area clear and free from combustible materials, gasoline and other  ammable vapors.
1
1
2
2
Remove wooden brace on front of pallet.
Open door completely. Rotate door hinge to
unlocked position.
Installation
General Information
3 4
Close the door until it stops. Push in/lift door up/and then out. Repeat for all
doors.