STEP 1
Before anchoring the chassis to the concrete
pad, make sure the gate and operator are
LEVEL and PARALLEL. Minimum distance
between the operator and gate is 3”.
Note: Before starting the installation procedure;
Open and close the gate manually, making sure there is sufficient space between
the gate and adjacent walls.
Check that the wheels are turning freely on the track and there are no restrictions
while pushing the gate to the open and closed positions.
Confirm that there is adequate spacing for the guide rollers and that there are no
restrictions throughout the travel of the gate.
STEP 2
Attach the operator to the concrete pad
using Red Head 1/2” x 3-1/2” Anchors.
Follow the manufacturers instructions for
proper installation. Refer to page 11 for hole
center dimensions.