PLAN OF INSTALLATION – CONCRETE PADSPLAN OF INSTALLATION – CONCRETE PADS
1. Follow the local building code to determine the required depth of the concrete pad.
2. Pad measurements recommended by Viking Access Systems are at lease 24” long,
18” wide and 24” deep to ensure the stable operation of the operator, and a
minimum of 4” above level grade to avoid any flooding of the machinery.
3. The path of the track must be 10” wide and at least 6” deep to support the
weight of the gate. Please consult the local building code for verification and
further details.
4. Provide a sufficient number of conduit pathways for all low power accessories
such as loop detector leads, maglock, non-contact sensors, contact sensors, safety
and other commands.Also provide conduit for the power supply (either 110 or
220 VAC). Extend the conduit the recommended height of 1” above the level of
the concrete pad. Install all conduit in the shaded area shown above.
Drill for a 1/2" x 3-1/2"
Red Head Anchor
(4) Places
18"
8.5"
1.5"
2"
24"
10"
6"
11"
Track
2"
4"
Minimum
4"
Minimum
24"
16"
13"
Conduit Location
5.5"
4"
Recommended
Area for
Conduit(s)
Possible Area
for Conduit(s)
(1" Maximum
Height)
Gate Operator Concrete Pad
Gate Operator Concrete Pad
Install a
Positive Stop
at Both Ends
of the Track
Operator Cover
Track Concrete Pad
Track Concrete Pad
Gate
Grade Level
See Note 2
Operator Chassis
10.375"
Center of
Drive Chain