Installation Guide
9
MODEL VG06043
4
OUTSIDE OF THE SHOWER
5mm
B. INSTALLING THE STRUCTURAL RAIL
1. Place the wall mount brackets (#1) on both
ends of the structural rail and lightly tighten
for dry fit purposes. Place rail into the cabin
opening. If the rail is too long, cut it with a
hacksaw to fit the opening.
Make sure to cut the rail on the door
side only.
2. Remove the fixed panel holder cover.
Place the fixed panel holder through the
hole in the fixed panel, replace the cover
and tighten. Note: There is a 5mm
horizontal adjustment in the structural
rail. If adjustments are needed, remove the
fixed panel holder cover to expose the
hollow hex screw. Using an allen key,
make your adjustments.
!
B1
B2
10
1
13
2
10
ALLEN KEY
SMALL HEX
HOLE
INSIDE OF THE SHOWER
COVER
HOLLOW HEX
ADJUSTMENT
SCREW