Service manual

58
ViewSonic Corporation Confidential - Do Not Copy PJ513D-1
3.3. OPT engine assembly and blower wire alignment
3.4. Power board assembly and power board wire alignment
1. First screw constrain
3. Third screw constrain
2. Second screw constrain
To keep the blower wire under
the heat sink of OPT engine.