User guide

Appendix F, Glossary
F-8 Ipro eCapture User Guide www.iprotech.com
Q1 2014 877-324-4776
Project Priority: In Ipro eCapture, a project’s priority (place in the queue) can
be changed. Priority values range from 1 to 10 with 1 representing the highest
priority. When a project’s priority is changed from 5 to 1 for example, then it
will be moved into the appropriate position in the Project Tree of the Client
Management tree view.
Project: In Ipro eCapture, the level beneath Client in the hierarchy. Projects
can have one or more Custodians.
QC: Quality Control: A process performed on a Processing Job to ensure
accuracy of the final, delivered data. QCing can be performed on one, some, or
all available categories and/or one, some, or all flags (Passed QC, Text
Missing, Low Priority, etc.)
Query: A set of criteria and logical operators used together or separately to
search documents during a processing job.
Queue: In Ipro eCapture, a term used to describe jobs that waiting to be
processed.
Queue Manager: The Queue Manager is responsible for the tasks that it
receives from the Ipro eCapture Controller. It assigns jobs to the Workers for
processing.
Queue Manager Configuration: Includes setting SQL Connection, Task
Distribution (System wide bandwidth throttle, queue manager task cache
count, queue manager bullpen trigger count, worker bandwidth throttle, queue
manager non-blocking update count, queue manager blocking update count,
and queue manager system exclusive update count), Functionality (allowed
embedded file extraction error percentage, allowed extraction error
percentage, allowed password protected percentage), Size Limits, and Worker
Instance Quantity.
QueueManager.LOG file: Located in the path of ...eCapture\QueueManager,
this file records: each task distributed by the Queue Manager, all hung job
detection activities, and any errors encountered by the Queue Manager when
attempting to query the SQL tables to distribute tasks.
Raw Text: In Ipro eCapture, extraction of raw text (text without any special
attributes) occurs when a Processing Job runs. Extract Raw Text is an option
available under Processing Options, General Options tab.
Ready: From the Worker Information Status Tab, Status column. The Worker
has one or more free threads and is waiting to be assigned a task.